Depot Building Has not complete yet
Depot Building Has not complete yet
I was founding that Depot, Station and Terminal building not complete yet, I found that in Cities0.FPK provided depoteurooverpass.nif and stationeurooverpass.nif wich that model having shelter but Firaxis or 2K games or develover this game not to implementation into game, please look to the picture below
What Are you comment....
What Are you comment....
Rodea2007 ( http://rodea2007.yolasite.com )
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
- Star Ranger4
- Posts: 157
- Joined: Thu Oct 18, 2007 2:59 am
Re: Depot Building Has not complete yet
hrrrm..... I wonder if those could be worked into the us depot structures as well?
Re: Depot Building Has not complete yet
Yes they can. All six structures have the same thing. An empty deck on the far side. I think they left it open to give the appearance of that was where cargo was off loaded. Although, that makes little sense since the animations dump the cargo in the tracks or it just vanishes. I guess it works with imagination and a prescription for happy meds.
Intel Core 2 Quad Q6600@2.4GHz
2 GB PC5400 DDR2 Ram
MB nVidia nForce 680i LT SLI
GC GeForce 7300GS 256MB PCI-E
HD 250GB + 500GB
OS Windows XP/SP2/32 bit
2 GB PC5400 DDR2 Ram
MB nVidia nForce 680i LT SLI
GC GeForce 7300GS 256MB PCI-E
HD 250GB + 500GB
OS Windows XP/SP2/32 bit
Re: Depot Building Has not complete yet
Those Model can working fine with all depot building include us model, Notice Terminal Building and station building, that is US Terminal and US Station Building, but you must have a little knowledge about Nif file to adding those model into your depot building in order to those model can be workingStar Ranger4 wrote:hrrrm..... I wonder if those could be worked into the us depot structures as well?
Rodea2007 ( http://rodea2007.yolasite.com )
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
- CalmDragon
- Posts: 137
- Joined: Thu Jun 07, 2007 7:08 pm
- Location: Los Angeles, California
- Contact:
Re: Depot Building Has not complete yet
Does a fourth station track run right through it
motherboard : Asus P5N-E SLI
processor: Dual Core 2.4 GHz
memory : 2046MB
video card: GeForce 8800GTS 640MB
operating system: winxp media
Display: 24" Dell at 1920x1200
processor: Dual Core 2.4 GHz
memory : 2046MB
video card: GeForce 8800GTS 640MB
operating system: winxp media
Display: 24" Dell at 1920x1200
Re: Depot Building Has not complete yet
Good point there......Those things need to be run thru Blender, or a like program, and the parts placement corrected, along with the person walking down thru space, or is it thru the wall?CalmDragon wrote:Does a fourth station track run right through it
I'm correct 97% of the time..... who cares about the other 4%....
- CalmDragon
- Posts: 137
- Joined: Thu Jun 07, 2007 7:08 pm
- Location: Los Angeles, California
- Contact:
Re: Depot Building Has not complete yet
Both the inward wall and the space where the stairs use to be before the four track patch.
motherboard : Asus P5N-E SLI
processor: Dual Core 2.4 GHz
memory : 2046MB
video card: GeForce 8800GTS 640MB
operating system: winxp media
Display: 24" Dell at 1920x1200
processor: Dual Core 2.4 GHz
memory : 2046MB
video card: GeForce 8800GTS 640MB
operating system: winxp media
Display: 24" Dell at 1920x1200
Re: Depot Building Has not complete yet
Actually that is no really matter, but I have done to edit station euro with 3dsmax 8 can be support full four tracks, Firaxis only revised TerminalUS and TerminalEuro(see Update_1_1_0_00.FPK) to support full four tracks but not to StationUS and StationEuro, please look at picture belowCalmDragon wrote:Does a fourth station track run right through it
Rodea2007 ( http://rodea2007.yolasite.com )
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
Re: Depot Building Has not complete yet
Now I was done revised all station building to fully show 4 tracks in station, noticed the picture below
Rodea2007 ( http://rodea2007.yolasite.com )
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
Facebook http://www.facebook.com/rodea2007
Note Book TOSHIBA SATELLITE L645
Processor Inter Core I-3
Memory 8 GB
Harddisk 320 GB
Windows 7 Ultimate 64 Bit
- CalmDragon
- Posts: 137
- Joined: Thu Jun 07, 2007 7:08 pm
- Location: Los Angeles, California
- Contact:
Re: Depot Building Has not complete yet
Looking Good!