Cargo delivery / route setup
Posted: Fri May 30, 2008 3:08 pm
I cannot figure out the following:
For example, I can bring cole to 2 cities B and C. I set up a new train route. A, B and C are directly connected. In this e.g. station C has the steel factory and I am the owner!
I begin with the cole mine at point A (inserted at line nr.1), and let’s say I can hang on 8 carts.
Then, I want to drop 4 loads on station B and the other 4 loads on station C. So I insert in line nr.2 4 loads and 4 loads on line nr.3.
It begins driving to station B with 8 loads, then drops 4 loads(autom.) here and put on 4 loads also here(sometimes it does not unloads, but the amount of loads stays with the train). The trains continue to drive to station C with the last 4 loads. Its unloads then my train set up to bring the steel to station D drives with emty carts.... With others word, it does not convert cole in to steel.
What I am doing wrong?
Can you please explain me how to use more than 2 lines, because setting up a route with two lines I understand.
Regards,
Daniel
For example, I can bring cole to 2 cities B and C. I set up a new train route. A, B and C are directly connected. In this e.g. station C has the steel factory and I am the owner!
I begin with the cole mine at point A (inserted at line nr.1), and let’s say I can hang on 8 carts.
Then, I want to drop 4 loads on station B and the other 4 loads on station C. So I insert in line nr.2 4 loads and 4 loads on line nr.3.
It begins driving to station B with 8 loads, then drops 4 loads(autom.) here and put on 4 loads also here(sometimes it does not unloads, but the amount of loads stays with the train). The trains continue to drive to station C with the last 4 loads. Its unloads then my train set up to bring the steel to station D drives with emty carts.... With others word, it does not convert cole in to steel.
What I am doing wrong?
Can you please explain me how to use more than 2 lines, because setting up a route with two lines I understand.